{"id":47198,"date":"2025-09-22T09:29:29","date_gmt":"2025-09-22T08:29:29","guid":{"rendered":"https:\/\/m5j0n6nk9p.onrocket.site\/?p=47198"},"modified":"2025-09-22T09:46:00","modified_gmt":"2025-09-22T08:46:00","slug":"klinger-portugal-garante-valvulas-seguras-para-distribuidora-de-gases","status":"publish","type":"post","link":"https:\/\/klinger.pt\/es\/klinger-portugal-garante-valvulas-seguras-para-distribuidora-de-gases\/","title":{"rendered":"KLINGER Portugal garante v\u00e1lvulas seguras para distribuidora de gases"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"470\" src=\"https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-1024x470.jpg\" alt=\"V\u00e1lvulas\" class=\"wp-image-47120\" srcset=\"https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-1024x470.jpg 1024w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-300x138.jpg 300w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-768x352.jpg 768w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-1536x705.jpg 1536w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1-1400x642.jpg 1400w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-01-1.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-left\">Uma das maiores empresas de distribui\u00e7\u00e3o de gases e combust\u00edveis, confiou \u00e0 KLINGER Portugal um projeto ambicioso. Qual era o objetivo? Criar um plano de renova\u00e7\u00e3o do parque de <a href=\"https:\/\/klinger.pt\/produtos\/valvulas\/\" target=\"_blank\" rel=\"noopener\" title=\"\">v\u00e1lvulas<\/a> instaladas, garantindo maior seguran\u00e7a e efici\u00eancia na distribui\u00e7\u00e3o.<\/p>\n\n\n\n<p>O desafio partiu de um cen\u00e1rio exigente. As v\u00e1lvulas de esfera existentes dos anos 90 , tornavam a sua manuten\u00e7\u00e3o e substitui\u00e7\u00e3o das pe\u00e7as de desgaste cada vez mais dif\u00edcil. <\/p>\n\n\n\n<p>Al\u00e9m do desgaste natural, algumas das suas pe\u00e7as eram feitas por medida e em materiais especiais, que por consequ\u00eancia se tornam dif\u00edceis de encontrar no mercado atual. <\/p>\n\n\n\n<p>Perante este cen\u00e1rio, a empresa avan\u00e7ar com o estudo de implementa\u00e7\u00e3o de renova\u00e7\u00e3o do parque de v\u00e1lvulas de um fabricante de elevado n\u00edvel de qualidade e que garantisse atualiza\u00e7\u00f5es e manuten\u00e7\u00f5es cont\u00ednuas sem percal\u00e7os. Foi aqui que entrou em a\u00e7\u00e3o a experi\u00eancia da KLINGER Portugal<strong>.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><strong>O ESTUDO T\u00c9CNICO:<\/strong><\/strong><\/h4>\n\n\n\n<p>O pedido inicial foi claro: substituir parte do parque das v\u00e1lvulas tentando preservar os espa\u00e7os ocupados, atrancamento e altura da v\u00e1lvula.<strong><\/strong><\/p>\n\n\n\n<p>Tendo por base os objetivos, foi feito pela KLINGER um levantamento t\u00e9cnico minucioso, comparando dimens\u00f5es, especifica\u00e7\u00f5es e requisitos de opera\u00e7\u00e3o. Apesar de surgirem algumas diverg\u00eancias t\u00e9cnicas, numa primeira fase o objetivo foi chegar a um or\u00e7amento de refer\u00eancia que pudesse ser aprovado pelo cliente, viabilizando dessa forma o projeto de altera\u00e7\u00e3o.<\/p>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-ad2f72ca wp-block-group-is-layout-flex\">\n<h4 class=\"wp-block-heading\"><strong>A IMPLEMENTA\u00c7\u00c3O:<\/strong><\/h4>\n<\/div>\n\n\n\n<p>Ap\u00f3s an\u00e1lise, aprova\u00e7\u00e3o t\u00e9cnica e or\u00e7amental, deu-se seguimento \u00e0 primeira fase de implementa\u00e7\u00e3o.<\/p>\n\n\n\n<p>Para garantir uma integra\u00e7\u00e3o perfeita, foi necess\u00e1rio:<\/p>\n\n\n\n<p>\u00bb Desenvolver documenta\u00e7\u00e3o e desenhos t\u00e9cnicos completos;<\/p>\n\n\n\n<p>\u00bb  Assegurar o encaixe ideal e exato preciso nas tubagens e locais de instala\u00e7\u00e3o<\/p>\n\n\n\n<p>\u00bb  Preservar os constrangimentos existentes<\/p>\n\n\n\n<p>\u00bb Manter os requisitos de seguran\u00e7a e desempenho<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"470\" src=\"https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-1024x470.jpg\" alt=\"V\u00e1lvulas\" class=\"wp-image-47111\" srcset=\"https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-1024x470.jpg 1024w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-300x138.jpg 300w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-768x352.jpg 768w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-1536x705.jpg 1536w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02-1400x642.jpg 1400w, https:\/\/klinger.pt\/wp-content\/uploads\/2025\/07\/fotos-editadas-02.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>O FUTURO<\/strong><\/h4>\n\n\n\n<p>A estrat\u00e9gia definida prev\u00ea que as v\u00e1lvulas restantes sejam substitu\u00eddas de forma faseada, \u00e0 medida que as antigas necessitem de manuten\u00e7\u00e3o.<\/p>\n\n\n\n<p> Desta forma, a KLINGER garante a continuidade da manuten\u00e7\u00e3o e opera\u00e7\u00e3o, reduzindo o risco de falhas inesperadas e uniformiza o sistema, simplificando interven\u00e7\u00f5es futuras.<\/p>\n\n\n\n<p>Este procedimento n\u00e3o s\u00f3 contribuiu para a moderniza\u00e7\u00e3o de uma infraestrutura cr\u00edtica, como tamb\u00e9m garantiu que o cliente esteja preparado para cumprir as exig\u00eancias operacionais, com um sistema seguro, fi\u00e1vel e eficiente.<\/p>\n\n\n\n<p>&nbsp;<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uma das maiores empresas de distribui\u00e7\u00e3o de gases e combust\u00edveis, confiou \u00e0 KLINGER Portugal um projeto ambicioso. Qual era o objetivo? Criar um plano de renova\u00e7\u00e3o do parque de v\u00e1lvulas instaladas, garantindo maior seguran\u00e7a e efici\u00eancia na distribui\u00e7\u00e3o. O desafio partiu de um cen\u00e1rio exigente. As v\u00e1lvulas de esfera existentes dos anos 90 , tornavam [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":47120,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[64],"tags":[411,409],"class_list":["post-47198","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-ball-valves","tag-valves-2"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/posts\/47198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/comments?post=47198"}],"version-history":[{"count":4,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/posts\/47198\/revisions"}],"predecessor-version":[{"id":47207,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/posts\/47198\/revisions\/47207"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/media\/47120"}],"wp:attachment":[{"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/media?parent=47198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/categories?post=47198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/klinger.pt\/es\/wp-json\/wp\/v2\/tags?post=47198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}